← Back to DocumentsDocument

Analysis of the Costs and Financial Analysis Prepared by Amax for the Mount Emmons Project

Categories: Molybdenum / Mt. Emmons
Source: Sustainable Living Library

Summary

Robert C. Steckley, Jim F. Lemons Jr. Minerals Availability Field Office United States Bureau of Mines.

Local Knowledge Graph (35 entities)

Loading graph...

Knowledge graph centered on Analysis of the Costs and Financial Analysis Prepa with 35 nodes and 74 connections. Top connected: United States Forest Service, Crested Butte, Colorado Department of Highways, AMAX, Bureau of Mines.

Stakeholders (5)

Agencies, organizations, and groups mentioned as actors in this document.

United States Forest ServiceColorado Department of HighwaysBureau of MinesAMAXMinerals Availability Field Office

External References Cited (6)

Works cited by this document, grouped by type.

report (4)

  • McGraw Hill's 1980 Dodge Guide to Public Works and Heavy Construction Costs (1980)L.A. McMahon Editor
  • McGraw Hill's 1980 Dodge Manual for Building Pricing and Scheduling (1980)P.E. Perciro, Chief Editor
  • Building Construction Cost Data (1978)A.S. Means Company Inc.
  • Heavy Construction cost file (1978)Van Nostrand Reinhold Company

book (2)

  • Modern Cost Engineering: Methods and Data (1979)
  • Chemical Engineering Plant Design (1959)Frank C. Filbrandt and Charles E. Dryden