Subject: Central Colorado Project (CCP), Western Renewable Energy & Water Productivity Multiplier
Summary
Correspondence (2007). Covers Palmer Lake, Colorado, Washington, DC. Topics: Central Colorado Project, pumped-storage, renewable energy, water productivity multiplier. Agencies: U.S. Department of Interior, U.S. Department of Agriculture, U.S Department of Energy. Cites 6 external works.
Local Knowledge Graph (41 entities)
Knowledge graph centered on Subject: Central Colorado Project (CCP), Western R with 41 nodes and 80 connections. Top connected: United States Environmental Protection Agency, United States Department of Agriculture, United States Bureau of Reclamation, United States Department of the Interior, Congress.
Stakeholders (15)
Agencies, organizations, and groups mentioned as actors in this document.
Show 7 more
Places (41)
Show 33 more
Concepts & Topics (13)
Species (9)
Show 1 more
External References Cited (6)
Works cited by this document, grouped by type.
report (5)
- Feasibility Level Geological and Geotechnical Investigation for Union Park Dam (2006) — Horst Ueblacker
- Feasibility Study and Preliminary Design of Union Park Dam (2006) — Horst Ueblacker
- Report of Findings of the Issue Evaluation, TAYLOR PARK DAM Uncompahgre Project (2002)
- PUEBLO DAM — RISK ANALYSIS Modified Dam Including Contraction Joint Leakage and Concrete Dam Tension Issues (2000) — Mark Steers and John Trojanowski
- Safety Evaluation of Existing Dams Analysis Summary (SEED Analysis Summary) TAYLOR PARK DAM (1989) — Becky Morfitt
study (1)
- Feasibility Level Geological and Geotechnical Investigations, and Preliminary Design Studies for Union Park Dam
Related Works
Items connected by shared entities, co-authorship, citations, or semantic similarity.