← Back to DocumentsDocument

Upper Gunnison Water Conservancy District (Volume 2)- Part 6

Date: 1994-01-01
Categories: Water, Land & Water Management, Gunnison Basin
Geographic scope: gunnison basin, upper gunnison
Source: Sustainable Living Library

Summary

President of Board: William S. Trampe Date: December 10, 1994 Budget, Citizens, Employment, Union Park Project, Taylor Park Reservoir,? Conservancy

Local Knowledge Graph (41 entities)

Loading graph...

Knowledge graph centered on Upper Gunnison Water Conservancy District (Volume with 41 nodes and 80 connections. Top connected: Unknown, not mentioned, Spruce, Atriplex canescens, United States Bureau of Land Management.

Stakeholders (35)

Agencies, organizations, and groups mentioned as actors in this document.

United States Bureau of Land ManagementUnited States Environmental Protection AgencyUnited States Bureau of ReclamationUnited States Fish and Wildlife ServiceUnited States Geological SurveyColorado Department of WildlifeColorado Water Conservation BoardGunnison County
Show 27 more
Upper Gunnison River Water Conservancy DistrictNational Park ServiceColorado River Water Conservation DistrictGunnison County CommissionersDepartment of InteriorCity of GunnisonColorado Supreme CourtHigh Country Citizens' AllianceState EngineerUncompahgre Valley Water Users' AssociationWestern Area Power AdministrationUnited StatesFERCUGRWCDDOWSupreme CourtUSBRNECOFWSColorado State Engineer's officeMt. Crested Butte Water and Sanitation DistrictCDHState Water Resources Control BoardColorado River Water Conservation BoardUpper Colorado RegionGrand Junction Projects OfficeUncompaghre Valley Water Users Association

External References Cited (30)

Works cited by this document, grouped by type.

other (13)

  • 3-01-93 draft agreement (1993)
  • draft Water Management Agreement (1993)
  • draft management agreement (1992)
  • Union Park water availability case (1991)
  • 1990 Agreement (1990)
Show 8 more other
  • 1990 Contract (1990)
  • Contract No. 6-07-01-00027 (1975)
  • 1975 Agreement (1975)
  • 1975 Contract (1975)
  • Case No. 86-CW-203
  • Supreme Court Decision 90SA498
  • Gunnison River Contract
  • Final Order in Case Nos. 86CW226 and 88CW178

report (9)

  • April 19 memorandum on Aspinall operations (1993)Tyler Martineau
  • April 23 memorandum on reservoir sites for planning model (1993)Tyler Martineau
  • High water 93 report (1993)
  • April 22, 1993 memorandum on Taylor Park Reservoir operations (1993)Tyler Martineau
  • Instream Flow Determinations for the Nature Conservancy Donation of a Conditional Water Right in the Gunnison River Basin (1991)
Show 4 more report
  • report to the Colorado Water Conservation Board (1991)R. Seaholm
  • Economic Justification Report for the Wayne N. Aspinall Unit (1959)
  • Economic Justification Report (1957)
  • Advance Identification of WetlandsEPA

study (5)

  • East River Quantity/Quality Water Study
  • Native fish of Gunnison River Basin assessment/recovery studyDr. Behnke
  • Gunnison County's 201 wastewater facilities study
  • East River StudyLynn Cudlip
  • Upper Gunnison-Uncompaghre Basin Phase 1 Feasibility Study

legislation (3)

  • Colorado River Storage Project Act (1956)
  • Federal Reclamation Laws (1902)
  • Colorado River Project Storage Act