Attachment 4 of Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Gunnison, CO

Date: 1990-01-01
Categories: Uranium, Environmental Contamination, Mining & Mineral Resources, Gunnison Basin
Geographic scope: gunnison basin
Source: Sustainable Living Library

Summary

Environmental assessment (June 1990). Covers Gunnison, Gunnison Landfill disposal site, Landfill disposal site. Topics: Water Resources Protection Strategy, uranium mill tailings, infiltration, disposal cell. Agencies: United States Department of Energy, U.S. Environmental Protection Agency, EPA. Cites 25 external works.

Local Knowledge Graph (41 entities)

Loading graph...

Knowledge graph centered on Attachment 4 of Remedial Action Plan and Site Desi with 41 nodes and 80 connections. Top connected: not specified, United States Environmental Protection Agency, United States Department of Energy, Colorado Department of Health, groundwater storage dynamics.

Stakeholders (8)

Agencies, organizations, and groups mentioned as actors in this document.

United States Environmental Protection AgencyUnited States Department of EnergyColorado Department of HealthAlbuquerque Operations OfficeUMTRA ProjectUranium Mill Tailings Remedial Action ProjectUMTRAPDOE UMTRA Project Office

External References Cited (25)

Works cited by this document, grouped by type.

report (15)

  • DOE, 1989a (1989)
  • Technical Approach Document, Revision II (1989)U.S. Department of Energy
  • Guidance for UMTRA Project Surveillance and Maintenance (1986)U.S. Department of Energy
  • Calculation GUN-05-90-14-10
  • Attachment 1
Show 10 more report
  • Calculations GUN-06-90-15-03
  • Calculations GUN-05-90-13-06
  • Calculation GUN-06-90-15-03-00
  • Calcualtion GUN-04-89-02-03-00
  • Attachment 3
  • Calculation GUN-643-03-00
  • Calculation GUN-643-02-00
  • UMTRA-DOE/AL 0000
  • Calculation GUN-04-89-02-03-00
  • Calculation GUN-04-90-12-07

legislation (5)

  • 40 CFR 192.02(a)(4)
  • 40 CFR 192.02
  • 40 CFR 264
  • 40 CFR 192
  • National Environmental Policy Act

regulation (4)

  • Subpart B of 40 CFR 192
  • 40 CFR 192.02(a)(3)
  • 40 CFR 192.02(a)(4)(b)
  • 40 CFR 192.02(c)

other (1)

  • Cooperative Agreement No. DE-FC04-85AI0533