Draft: Environmental Assessment of the Proposed Remedial Action at the Gunnison Uranium Mill Tailings Site
Summary
Environmental assessment. Covers Gunnison Uranium Mill Tailings Site, Gunnison, Gunnison River. Topics: remedial action, uranium mill tailings, hazardous waste management, ground-water protection. Agencies: Regional Administrator, Office of Management and Budget, Environmental Protection Agency. Cites 18 external works.
Local Knowledge Graph (41 entities)
Knowledge graph centered on Draft: Environmental Assessment of the Proposed Re with 41 nodes and 80 connections. Top connected: I. aggregata, United States Bureau of Land Management, not specified, United States Environmental Protection Agency, Potentilla.
Stakeholders (11)
Agencies, organizations, and groups mentioned as actors in this document.
Show 3 more
Places (18)
Concepts & Topics (34)
Show 26 more
Species (62)
Show 54 more
External References Cited (24)
Works cited by this document, grouped by type.
legislation (9)
- 40 CFR Ch. I (1989)
- Federal Register provisions (1982)
- Atomic Energy Act of 1954 (1954)
- section 84 of the Act
- RCRA regulations
Show 4 more legislation
- Title I of the Act
- Pub. L. 92-314
- section 108
- section 83 of the Act
regulation (6)
- 40 CFR Ch. I (7-1-89 Edition) (1989)
- 53 FR 37935 (1988)
- 52 FR 46963 (1987)
- 51 FR 16444 (1986)
- Subpart A
Show 1 more regulation
- Criterion 7
other (6)
- Jacobsen, Ken, 1989 (1990) — Engineering Group Inc., Albuquerque, New Mexico, dated July 12
- usage Grouse Di stri buti on and Habitat Use in the Gunnison Basin," in Quarterly Reoort, April, 1985, Colorado Division of Wildlife, Fort Collins, Colorado (1985) — Hupp, J
- ••Dormant Stub Planting Techniques,• in Riparian Ecosystems and their Management: Reconciling Conflicting Uses, U.S (1985) — York, J. C
- "Avian Use of a Desert Riparian Island and its Adjacent Scrub Habitat,u in The Condor, Vol (1985) — Szaro, R. C., and M. D. Jakle
- •Revegetating Riparian Trees in South- western Floodplains,•• in Riparian Ecosystems and Their Management: Recon- ciling Conflicting Use, U.S (1985) — Swenson, E. A., and C. L. Mullins
Show 1 more other
- uMaximum Floodflows in the Conterminous United States," Geological Survey Water-Supply Paper 1887, U.S (1977) — Crippen, J. R. and C. D. Bue
report (2)
- DOE, 1990c (1990)
- Report on Games Species of Concern Associated with the Gunnison Remedial Action Project, Gunnison, Colorado (1990) — TAC
plan (1)
- Remedial Action Plan and Site Design (1990) — DOE
Related Works
Items connected by shared entities, co-authorship, citations, or semantic similarity.