← Back to DocumentsDocument

Environmental Assessment of Ground Water Compliance at the Gunnison, CO UMTRA Project Site

Date: 2001-01-01
Categories: Uranium, Gunnison Basin
Geographic scope: gunnison basin
Source: Sustainable Living Library

Summary

Environmental assessment (1958-2001). Covers Gunnison, Colorado, Grand Junction. Topics: ground water compliance, ground water contamination, uranium mill tailings, natural flushing. Agencies: U.S. Department of Energy, U.S. Environmental Protection Agency, Colorado Department of Public Health and Environment. Cites 29 external works.

Local Knowledge Graph (41 entities)

Loading graph...

Knowledge graph centered on Environmental Assessment of Ground Water Complianc with 41 nodes and 80 connections. Top connected: Unknown, United States Environmental Protection Agency, small mammals, United States Geological Survey, United States Fish and Wildlife Service.

Stakeholders (17)

Agencies, organizations, and groups mentioned as actors in this document.

United States Environmental Protection AgencyUnited States Fish and Wildlife ServiceUnited States Geological SurveyUnited States Department of EnergyGunnison CountyGunnison County CommissionersState of ColoradoNuclear Regulatory Commission
Show 9 more
National Oceanic and Atmospheric AdministrationAtomic Energy CommissionColorado Department of Local AffairsColorado Department of Public Health and EnvironmentCDPHEDOE Grand Junction Project OfficeDos Rios Water and Sanitation DistrictU.S. DEPARTMENT OF ENERGY GRAND JUNCTION OFFICEGunnison County Public Works Department

External References Cited (29)

Works cited by this document, grouped by type.

report (12)

  • SOWP (2001)
  • Site Observational Work Plan (2001)DOE
  • DOE 2001a (2001)
  • Ground water flow and transport modeling (2001)
  • Programmatic Environmental Impact Statement for the UMTRA Ground Water Project (1996)DOE
Show 7 more report
  • Baseline Risk Assessment (1996)DOE
  • Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Site Near Gunnison, Colorado (1996)
  • Final Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project (1996)
  • Environmental Assessment of Remedial Action at the Gunnison Uranium Mill Tailings Site Near Gunnison, Colorado (1992)DOE
  • FBDU 1981 (1981)
  • PEIS
  • BLRA

legislation (9)

  • Executive Order 12898, Federal Actions to Address Environmental justice in Minority Populations and Low-Income Populations
  • National Environmental Policy Act
  • 40 CFR 192.12(c)(3)
  • Uranium Mill Tailings Radiation Control Act
  • UMTRCA
Show 4 more legislation
  • Code of Federal Regulations, Title 10, Part 1021, National Environmental Policy Act Implementing Procedures
  • Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings
  • 40 CFR 192
  • 40 CFR 192.12(c)(2)

environmental assessment (2)

  • surface remediation EA (1992)
  • Environmental Assessment of the Provision of a Water Supply System Gunnison, Colorado (1991)

plan (2)

  • Public Involvement Plan (2000)
  • Summary of Site Conditions and Work Plan

study (2)

  • screening-level human health risk analysis (1996)
  • Computer modeling study (1992)

other (1)

  • Cooperative Agreement Between the United States Department of Energy and the State of Colorado (1981)

regulation (1)

  • National Environmental Policy Act Implementing Procedures (1997)